Key Decisions

Forward Plan List No. 89  (01/07/2009 to 31/10/2009)

List items
No. Item

1.

*KD 2202 Restructure of Community Housing Services – Homeless Persons, Housing Advice, Housing Assessments and Reception functions to create a homelessness prevention service.

Decision maker:  Director of Health and Adult Social Care)

Decision:   Not before 1st Jan 2010

Originally due:   1 Dec 2008

Lead officer:  Sally McTernan

Decision status:  Recommendations Approved

2.

*KD 2563 Approval to accept a tender for major external refurbishment works to Welch & Woolpack Houses,

Decision maker:  Cabinet Member for Social Housing

Decision due:   Not before 1st Sep 2009

Originally due:   3 Mar 2008

Lead officer:  David Manning

Decision status:  Abandoned

3.

*KD 2568 Award tender for the contract hire of approximately thirty-Five 3.5t caged tippers and approximately three 7.5t fly tip vehicles as per the Council’s vehicle replacement programme.

Decision maker:  Gary Barnes (Acting Director Property)

Decision:   Not before 1st Nov 2010

Originally due:   1 Apr 2008

Lead officer:  Karen Newport

Decision status:  Recommendations Approved

4.

*KD 2583 To agree those issues necessary following the ALMO go live on the 1st April 2008.

Decision maker:  Cabinet Member for Social Housing

Decision due:   Not before 1st Feb 2011

Originally due:   5 Mar 2008

Lead officer:  John Austin

Decision status:  Abandoned

5.

KD 2600 Approval to accept a tender in respect of one contract covering both internal and external works to properties in the Lincoln Road area to address non-decency.

Decision maker:  Cabinet Member for Social Housing

Decision:   Not before 2nd Aug 2010

Originally due:   4 May 2008

Lead officer:  Kevin Connolly

Decision status:  Recommendations Approved

6.

KD 2601 Approval to accept a tender in respect of one contract covering both internal and external works to properties in the Third Avenue area to address non-decency.

Decision maker:  Cabinet Member for Social Housing

Decision:   Not before 2nd Aug 2010

Originally due:   8 May 2008

Lead officer:  Kevin Connolly

Decision status:  Recommendations Approved

7.

KD 2602 Approval to accept a tender in respect of one contract covering both internal and external works to properties in the Turkey Street area to address non-decency.

Decision maker:  Cabinet Member for Social Housing

Decision:   Not before 2nd Aug 2010

Originally due:   8 May 2008

Lead officer:  Kevin Connolly

Decision status:  Recommendations Approved

8.

*KD 2603 Approval to accept a tender in respect of one contract covering both internal and external works to properties in the Brick Lane/ Stoneleigh Ave area to address non-decency.

Decision maker:  Cabinet Member for Social Housing

Decision:   Not before 1st Jan 2010

Originally due:   8 May 2008

Lead officer:  Kevin Connolly

Decision status:  Recommendations Approved

9.

*KD 2625 Approval to secure nursing beds for Older People within Enfield

Decision maker:  Cabinet Member for Health & Social Care, Director of Health and Adult Social Care)

Decision:   Not before 1st Aug 2011

Originally due:   1 Jul 2011

Lead officer:  Michael Sprosson

Decision status:  Recommendations Approved

10.

*KD 2626 Approval to establish a Select List of high quality, cost effective residential and nursing care services..

Decision maker:  Cabinet Member for Health & Social Care, Director of Health and Adult Social Care)

Decision due:   Not before 1st Feb 2012

Originally due:   1 Mar 2011

Lead officer:  Michael Sprosson

Decision status:  Abandoned

11.

*KD 3382 Cabinet will be asked to approve the disposal and letting of Council owned Sites

Decision maker:  James Rolfe (Executive Director Resources)

Decision:   Not before 1st Dec 2011

Lead officer:  Brian Smart

Decision status:  Recommendations Approved

12.

*KD 2685 Award of Commission to consultant for preparation of tender documents for framework agreement to supply and install inclusive adaptations

Decision maker:  Director of Place Shaping & Enterprise

Decision due:   Not before 1st Sep 2010

Originally due:   1 Aug 2008

Lead officer:  Paul Dawson

Decision status:  Abandoned

13.

*KD 2686 Award of Commission framework agreement to supply and install inclusive adaptations

Decision maker:  Director of Place Shaping & Enterprise

Decision due:   Not before 1st Sep 2010

Originally due:   1 Oct 2008

Lead officer:  Paul Dawson

Decision status:  Abandoned

14.

*KD 2726 Accommodation for the Integrated Learning Difficulties Service. This DAR will be to seek authority to let a contract and release capital monies

Decision maker:  Director of Health and Adult Social Care)

Decision:   Not before 1st Sep 2009

Originally due:   3 Nov 2008

Lead officer:  Niel Niehorster

Decision status:  Recommendations Approved

15.

*KD 2744 To agree to proceed with the setting up of a framework of training organisations who could be ‘called off’ by the Development and Training team during the time period (three plus one years)

Decision maker:  Cabinet Member for Health & Social Care, Director of Health and Adult Social Care)

Decision due:   Not before 1st Sep 2010

Originally due:   3 Nov 2008

Lead officer:  Doug Wilson

Decision status:  Abandoned

16.

*KD 2746 To award contracts to training organisations who could be ‘called off’ from a framework by the Development and Training team during the time period (three plus one years)

Decision maker:  Cabinet Member for Health & Social Care, Director of Health and Adult Social Care)

Decision due:   Not before 1st Oct 2010

Originally due:   1 Jan 2009

Lead officer:  Doug Wilson

Decision status:  Abandoned

17.

*KD 2750 To seek permission to tender for the refurbishment of Formont for people with learning difficulties and high complex needs.

Decision maker:  Cabinet Member for Health & Social Care, Director of Health and Adult Social Care)

Decision:   Not before 1st Jul 2009

Originally due:   3 Nov 2008

Lead officer:  Niel Niehorster

Decision status:  Recommendations Approved

18.

*KD 2751 To approve the publication of the Pre Submission Report of the Core Strategy of the Local Development Framework and submission of the Report to the Secretary of State.

Decision maker:  Cabinet, Council

Decision:   11 Nov 2009

Originally due:   14 Aug 2009

Lead officer:  Joanne Woodward

Decision status:  Recommendations Approved

19.

*KD 2753 Allocation of Early Years Capital Grant for Quality & Access for all Young Children - £1,548,487 provided by Department for Children Schools & Families

Decision maker:  Cabinet Member for Children's Services

Decision:   Not before 1st Jul 2009

Originally due:   17 Nov 2008

Lead officer:  Peter Chapman

Decision status:  Recommendations Approved

20.

*KD 2767 Approval to the Fire Prevention Programme 2009/10

Decision maker:  Cabinet Member for Children's Services, (Director of Schools & Children's Services)

Decision due:   Not before 1st Jul 2010

Originally due:   1 Dec 2008

Lead officer:  Peter Dyster

Decision status:  Abandoned

21.

KD 2768 IT Contract - Appointment of external legal support during the re-tender process

Decision maker:  James Rolfe (Executive Director Resources)

Decision:   Not before 2nd Nov 2009

Originally due:   2 Feb 2009

Lead officer:  Dean Francis

Decision status:  Recommendations Approved

22.

*KD 2784 Restructuring of the Internal Audit & Risk Management Teams

Decision maker:  James Rolfe (Executive Director Resources)

Decision due:   Not before 1st Sep 2009

Originally due:   1 Dec 2008

Lead officer:  John Austin

Decision status:  Abandoned

23.

*KD 2791 Relocation of a library service point and associated issues (including projected costs and replacement use for existing library site)

Decision maker:  Cabinet Member for Public Health

Decision:   Not before 3rd Aug 2009

Originally due:   9 Jan 2009

Lead officer:  Julie Gibson

Decision status:  Recommendations Approved

24.

*KD 2793 To accept a tender and award the contract for the refurbishment of 4 toilets in B block of the Civic Centre. To accept a tender and award the contract for 5 toilets in A block of the Civic Centre.

Decision maker:  Director of Place Shaping & Enterprise

Decision:   Not before 2nd Nov 2009

Originally due:   1 Jan 2009

Lead officer:  Chris Stockman

Decision status:  Recommendations Approved

25.

*KD 2795 To agree the release of capital funding and award a contract on the basis of the best value tender for the refurbishment of Formont for people with Learning difficulties and high complex needs.

Decision maker:  Cabinet Member for Health & Social Care, Director of Health and Adult Social Care)

Decision:   Not before 1st Jan 2010

Originally due:   1 Apr 2009

Lead officer:  Niel Niehorster

Decision status:  Recommendations Approved

26.

*KD 2845 Approval to the pre tender estimate for the expansion of St John and St James CE Primary School

Decision maker:  Cabinet Member for Children's Services, (Director of Schools & Children's Services)

Decision due:   Not before 1st Oct 2009

Originally due:   1 Apr 2009

Lead officer:  Sue Watson

Decision status:  Abandoned

27.

KD 2846 Approval to the tender for a new dining hall and classrooms at Raglan Infants School.

Decision maker:  Cabinet Member for Children's Services, (Director of Schools & Children's Services)

Decision:   Not before 1st Jul 2009

Originally due:   1 Apr 2009

Lead officer:  Amanda Doherty

Decision status:  Recommendations Approved

28.

*KD 2847 Approval to the tender for the second phase of work to the curtain wall at Southgate School.

Decision maker:  Cabinet Member for Children's Services, (Director of Schools & Children's Services)

Decision:   Not before 3rd Aug 2009

Originally due:   1 Apr 2009

Lead officer:  Robert Goddin

Decision status:  Recommendations Approved

29.

*KD 2851 Approval to the transfer of land to Cuckoo Hall Primary School on change to Foundation Status.

Decision maker:  Cabinet Member for Children's Services, (Director of Schools & Children's Services)

Decision:   Not before 1st Oct 2009

Originally due:   1 Apr 2009

Lead officer:  Peter Dyster

Decision status:  Recommendations Approved

30.

*KD 2852 To approve the demolition of Claverings multi storey car park and to extend the existing floor slab to provide parking at ground floor level. This will provide approximately 60 parking spaces.

Decision maker:  Director of Place Shaping & Enterprise

Decision:   Not before 1st Feb 2011

Originally due:   1 Apr 2009

Lead officer:  Justin Caslake

Decision status:  Recommendations Approved

31.

*KD 2878 Draw down Capital funding for the new Edmonton Access Centre as agreed for 2008/9 capital programme and award of contracts.

Decision maker:  Cabinet Member for Customer Focus, Communications & Corporate Improvement

Decision:   Not before 3rd Aug 2009

Originally due:   1 Jun 2009

Lead officer:  Kate Robertson

Decision status:  Recommendations Approved

32.

KD 2864 Approval to accept a tender in respect of three contracts covering alterations to comply with DDA requirements and general refurbishment of Halls. The scheme to be referred to as Borough Wide Halls.

Decision maker:  Cabinet Member for Social Housing

Decision:   Not before 1st Jul 2009

Originally due:   1 Jun 2009

Lead officer:  Elpida Andreou

Decision status:  Recommendations Approved

33.

*KD 2867 Allocation of Performance Reward Grant (PRG) received to the area through the successful delivery of the Local Area Agreement (LAA) 2006-2009.

Decision maker:  Leader of the Council

Decision due:   Not before 1st Jun 2011

Lead officer:  Simon Tendeter

Decision status:  Abandoned

34.

KD 2868 The procurement of a Cashless Payment System capable of managing catering and other payments received schools and leisure & arts complexes

Decision maker:  Cabinet Member for Children's Services

Decision:   Not before 1st Jul 2009

Originally due:   1 Jun 2009

Lead officer:  Sangeeta Brown

Decision status:  Recommendations Approved

35.

KD 2886 Approval to accept a tender in respect of one contract covering extensions, alterations and general refurbishment of 3 properties. The scheme to be referred to as ODPM08

Decision maker:  Cabinet Member for Social Housing

Decision:   Not before 1st Oct 2009

Originally due:   1 Jun 2009

Lead officer:  Elpida Andreou

Decision status:  Recommendations Approved

36.

KD 2889 Approval to the demolition of former Salisbury School buildings on the Nightingale Site.

Decision maker:  Cabinet Member for Children's Services, (Director of Schools & Children's Services)

Decision:   Not before 1st Jul 2009

Originally due:   1 Jun 2009

Lead officer:  Peter Dyster

Decision status:  Recommendations Approved

37.

*KD 2897 To implement an environmental improvement scheme in the Tottenhall Road area. Measures to include a one way system and the replacement of speed cushions with speed tables. New Item!

Decision maker:  Cabinet Member for Environment

Decision:   Not before 3rd Aug 2009

Originally due:   1 Jul 2009

Lead officer:  Liam Mulrooney

Decision status:  Recommendations Approved

38.

*KD 2899 Award tender for the contract hire of approximately 14 sweepers of varying specification as per the Council’s vehicle replacement programme New Item!

Decision maker:  Gary Barnes (Acting Director Property)

Decision due:   Not before 3rd Aug 2009

Originally due:   1 Jul 2009

Lead officer:  Karen Newport

Decision status:  Abandoned

39.

*KD 2896 Authorisation of the Conservation Management Plan for Millfield House, part of Millfield Arts Centre.

Decision maker:  Cabinet Member for Public Health

Decision due:   2 Nov 2009

Originally due:   17 Jun 2009

Lead officer:  Lorraine Cox

Decision status:  Abandoned

40.

*KD 2843 - a) To approve the tendering out of security contracted staffing of Civic buildings etc, in accordance with LBE contract procedures, conducted in partnership with LBE Procurement and Legal departments. Contract due to expire 30 June 2009.

Decision maker:  Cabinet

Decision:   Not before 24th Mar 2010

Originally due:   1 May 2009

Lead officer:  Stuart Simper

Decision status:  Recommendations Approved

41.

*KD 2888 Reprovision of Southgate Circus Library and the disposal of the site at High street, Southgate, N14 6BP

Decision maker:  Cabinet Member for Public Health

Decision due:   Not before 3rd Aug 2009

Originally due:   1 Jul 2009

Lead officer:  Julie Gibson

Decision status:  Abandoned

42.

KD 2891 Thomas Hardy House Performance Space – future proposals

Decision maker:  Cabinet Member for Public Health

Decision:   Not before 1st Jul 2009

Originally due:   1 Jul 2009

Lead officer:  Liz Cody

Decision status:  Recommendations Approved

43.

*KD 2900 Allocation of funding to support the prevention of homelessness. New Item!

Decision maker:  Cabinet Member for Social Housing, Director of Health and Adult Social Care)

Decision:   Not before 1st Dec 2010

Originally due:   1 Jul 2009

Lead officer:  Sally McTernan

Decision status:  Recommendations Approved

44.

*KD 2901 Transforming Social Care: New Item!

Decision maker:  Cabinet Member for Health & Social Care, Director of Health and Adult Social Care)

Decision:   Not before 1st Sep 2009

Originally due:   1 Jul 2009

Lead officer:  Joyce Webster

Decision status:  Recommendations Approved

45.

*KD 2903 To waive contract standing orders to put in place a joint Supporting People and Social Care contract for the provision of Supported Housing, Housing Related Support and Social Care for 8 people with enduring Mental issues. New Item!

Decision maker:  Cabinet Member for Health & Social Care, Director of Health and Adult Social Care)

Decision due:   Not before 1st Aug 2011

Originally due:   1 Jul 2011

Lead officer:  Pauline Kettless

Decision status:  Abandoned

46.

*KD 2904 This report sets out a proposal to extend the existing contract with Enfield Disability Action for providing support services for social service users on the direct payments scheme by one year at an enhanced rate. New Item!

Decision maker:  Director of Health and Adult Social Care), Cabinet Member for Health & Social Care

Decision:   Not before 1st Sep 2009

Originally due:   1 Jul 2009

Lead officer:  Matt White

Decision status:  Recommendations Approved

47.

KD 2905 Approval to the negotiated tender to replace windows to the north and east elevations of Bowes Primary School. New Item!

Decision maker:  (Director of Schools & Children's Services)

Decision:   Not before 1st Jul 2009

Lead officer:  John West

Decision status:  Recommendations Approved

48.

*KD 2906 Approval to the proposed programme for improvements to school kitchens & dining facilities. New Item!

Decision maker:  (Director of Schools & Children's Services), Cabinet Member for Children's Services

Decision:   Not before 1st Apr 2011

Originally due:   1 Jul 2010

Lead officer:  Peter Dyster

Decision status:  Recommendations Approved

49.

KD 2908 To write-off miscellaneous debts considered irrecoverable by the Council.

Decision maker:  Cabinet Member for Finance & Procurement

Decision:   Not before 3rd Aug 2009

Originally due:   2 Mar 2009

Lead officer:  Paul Reddaway

Decision status:  Recommendations Approved

50.

KD 2917 To accept the tender and award the contract for the supply of electricity for the half hourly monthly accounts.

Decision maker:  James Rolfe (Executive Director Resources)

Decision:   Not before 2nd Aug 2010

Originally due:   2 Feb 2009

Lead officer:  Chris Stockman, Catharine Southern

Decision status:  Recommendations Approved

51.

KD 2916 Allocation of Department of Health Grants (Adult Social Services) 2009/10 - Mental Health Grant, Carers Grant, Training Grant etc.

Decision maker:  Cabinet Member for Health & Social Care

Decision:   Not before 2nd Nov 2009

Originally due:   1 Jul 2008

Lead officer:  Bindi Nagra

Decision status:  Recommendations Approved

52.

KD 2915 To Authorise the Purchase of Adults and Children's Social Care Packages

Decision maker:  Bindi Nagra (Director of Adult Social Care)

Decision due:   Not before 1st Jan 2019

Lead officer:  Paul Vernham

Decision status:  Abandoned

Notice of proposed decision first published: 28/02/2014

53.

*KD 2716 Building Schools for the Future (BSF), Enfield Strategy for Change (SfC), Part 1

Decision maker:  Cabinet

Decision:   15 Jul 2009

Originally due:   17 Dec 2008

Lead officer:  Caroline Baker, Bridget Evans

Decision status:  Recommendations Approved

54.

KD 2861 Income Collection Targets 2009/10

Decision maker:  Cabinet

Decision:   15 Jul 2009

Originally due:   21 May 2009

Lead officer:  Paul Reddaway, Geoff Waterton

Decision status:  Recommendations Approved

55.

*KD 2865 To agree Joint arrangement for Commissioning and Public Health between the Council and NHS Enfield

Decision maker:  Cabinet

Decision:   Not before 3rd Aug 2009

Originally due:   15 Jul 2009

Lead officer:  Bindi Nagra

Decision status:  Recommendations Approved

56.

KD 2869 Environment and Street Scene Additional Capital Allocation.

Decision maker:  Cabinet, Council

Decision:   Not before 17th Sep 2009

Originally due:   1 Jun 2009

Lead officer:  Gary Barnes

Decision status:  Recommendations Approved

57.

KD 2872 Forty Hall and Estates Restoration Project – financial , staffing and management implications

Decision maker:  Cabinet

Decision:   15 Jul 2009

Lead officer:  Liz Cody

Decision status:  Recommendations Approved

58.

KD 2879 Building Schools for the Future (BSF), Local Education Partnership (LEP) and BSF Project Development Funding

Decision maker:  Cabinet

Decision:   15 Jul 2009

Originally due:   17 Jun 2009

Lead officer:  Bridget Evans

Decision status:  Recommendations Approved

59.

KD 2881 Approval to the Outline Business Case for the new Oasis Academy Hadley on the Ponders End site.

Decision maker:  Cabinet

Decision:   16 Dec 2009

Originally due:   15 Jul 2009

Lead officer:  Jennifer Hill

Decision status:  Recommendations Approved

60.

KD 2882 Capital Outturn 2008/09 Approval of the capital outturn position and statutory funding recommendations at the end of March 2009

Decision maker:  Cabinet

Decision:   15 Jul 2009

Lead officer:  Graham Dixon

Decision status:  Recommendations Approved

61.

KD 2883 Revenue Outturn report for 2008/09Approval of the revenue outturn report at the end of the 2008/09 financial year.

Decision maker:  Cabinet

Decision:   15 Jul 2009

Lead officer:  Graham Dixon

Decision status:  Recommendations Approved

62.

KD 2884 May 2009 Revenue Monitoring Report. Approval of the revenue monitoring position at the end of May 2009 and actions needed in order to remain within the approved budget.

Decision maker:  Cabinet

Decision:   15 Jul 2009

Lead officer:  Graham Dixon

Decision status:  Recommendations Approved

63.

KD 2885 Capital Monitoring & Prudential Indicator Report first quarter. Approval of the capital monitoring position at the end of May 2008 and actions needed in order to remain within the approved budget.

Decision maker:  Cabinet

Decision:   15 Jul 2009

Lead officer:  Graham Dixon

Decision status:  Recommendations Approved

64.

KD 2902 Approval to extend performance related pay to middle manager posts across the Council. New Item!

Decision maker:  Cabinet

Decision:   15 Jul 2009

Lead officer:  Olive Jones, Tim Strong

Decision status:  Recommendations Approved

65.

KD 2912 To amend the Council’s Parking & Enforcement Plan New Item!

Decision maker:  Cabinet

Decision:   7 Oct 2009

Originally due:   15 Jul 2009

Lead officer:  David Taylor

Decision status:  Recommendations Approved

66.

*KD 2204 Review of the Council’s existing housing allocations policy

Decision maker:  Cabinet

Decision due:   13 Oct 2010

Originally due:   1 Jan 2008

Lead officer:  Sally McTernan

Decision status:  Abandoned

67.

KD 2309 Award of contract for Minicab and Taxi Services.

Decision maker:  Cabinet

Decision due:   Not before 1st Mar 2010

Originally due:   1 Apr 2009

Lead officer:  Lynn Brana

Decision status:  Abandoned

68.

KD 2730 Architectural Services – Proposed outsourcing

Decision maker:  Cabinet

Decision due:   Not before 1st Dec 2009

Originally due:   26 Nov 2008

Lead officer:  Iain MacDonald

Decision status:  Abandoned

69.

*KD 2757 Conservation Area Review Phase III To consider representations received on Phase III of the review and approve Character Appraisals and management proposals arising.

Decision maker:  Cabinet

Decision:   25 Nov 2009

Originally due:   15 Jul 2009

Lead officer:  Mike Brown

Decision status:  Recommendations Approved

70.

*KD 2756 Conservation Area Review Phase III To implement Phase III of the review including Character Appraisals and management proposals.

Decision maker:  Cabinet

Decision:   16 Sep 2009

Originally due:   17 Dec 2008

Lead officer:  Mike Brown

Decision status:  Recommendations Approved

71.

KD 2840 Replacement of the Revenues and Benefits computer system and related software (which collects Business Rates and Council Tax, and manages Housing and Council Tax benefit).

Decision maker:  Cabinet

Decision:   3 Mar 2010

Originally due:   20 Jan 2010

Lead officer:  Stuart Dennison

Decision status:  Recommendations Approved

72.

KD 2871 This decision asks Cabinet to approve the Olympic Policy for the Borough. The policy identifies and number of Objectives that have been consulted on widely

Decision maker:  Cabinet

Decision:   16 Sep 2009

Originally due:   17 Jun 2009

Lead officer:  Simon Gardner

Decision status:  Recommendations Approved

73.

KD 2880 New depot Provision – Proposed purchase of new site

Decision maker:  Cabinet

Decision due:   Not before 16th Sep 2009

Originally due:   1 Jun 2009

Lead officer:  Robin Carter

Decision status:  Abandoned

74.

KD 2890 Building Schools for the Future (BSF), EnfieldStrategy for Change Part 2 (SfC2)

Decision maker:  Cabinet

Decision:   16 Sep 2009

Lead officer:  Caroline Baker, Bridget Evans

Decision status:  Recommendations Approved

75.

KD 2892 July 2009 Revenue Monitoring Report.

Decision maker:  Cabinet

Decision:   16 Sep 2009

Lead officer:  Graham Dixon

Decision status:  Recommendations Approved

76.

KD 2898 Approve the 3 Borough Mental Health Strategy New Item!

Decision maker:  Cabinet

Decision:   16 Sep 2009

Originally due:   1 Jul 2009

Lead officer:  Bindi Nagra

Decision status:  Recommendations Approved

77.

KD 2913 The Report gives details of the application for transport related spending within the Local Implementation Plan (LIP) grant , from Transport for London, for 2010/2011 New Item!

Decision maker:  Cabinet

Decision:   16 Sep 2009

Lead officer:  Ranj Chandrasena

Decision status:  Recommendations Approved

78.

KD 2914 Scrutiny Annual Work Programme 2009/10 New Item!

Decision maker:  Cabinet, Council

Decision:   23 Sep 2009

Lead officer:  James Kinsella

Decision status:  Recommendations Approved

79.

KD 2907 Approval to award the contract(s) for externally purchased Home Based Support Services. New Item!

Decision maker:  Cabinet

Decision:   24 Mar 2010

Originally due:   7 Oct 2009

Lead officer:  Michael Sprosson

Decision status:  Recommendations Approved